Tag Archives: lining

Making Our Manila Authentic

For the past year, we’ve been making eye splices and wire-manila splices in our “manila”, which was made for us by Martin Coombs. Since manila fiber does not scale down in size, our manila line wouldn’t look correct if made from the real thing, so we opted for cotton.
To add a touch of manila color we steep our lines in Lipton tea. The irony of using Lipton Tea bags has not been lost on us! So I ask, who really won? Who is best remembered from the 1903 series?
20160424_100456
Lines have been hanging to dry and going slack. These had been pulled taut and all kinks and twists taken out when hung to dry.
20160424_100532
Our process also highlights old school seamanship items. From the Marlinspike seamanship chapter in “The Bluejacket’s Manual 1944,” given to us by Chris Bade:
1. “Line shrinks in length when wet and , unless allowed to shrink freely, subjects itself to a strain as great or greater than it would carry under a load. For this reason, lines which are belayed should be slacked when wet…”
2. “The size of fiber line, except small stuff, is specified by the number of inches in its circumference…the length of fiber line is given in fathoms.”

New Contributions; an Early Christmas!

Bob Dollar of R&W Rope, New Bedford, Mass. has again contributed to the RELIANCE Project; this time, with various sizes of faux manila line (manila fibers do not scale down by 1/6th and thus would not look appropriate). Now all we have to figure out is how to translate 12, 30, 45, 60, 75, and 90 size line (as shown) into real world manila line dimensions. The size of manila line is measured in circumference, while wire rope and new synthetic fiber lines are measured in diameter.

1 Manila Line

We also just received our first lot of nickel-plated chain plates, staples, and turnbuckles from Tom Perkins of R.E. Sturdy Company in Providence. A number of RELIANCE fittings were nickel steel, but we are limited to casting and shaping brass or bronze. Our “Guy Upstairs” Dave Stewart of Systematics Inc. has been our intermediary for this project, so we do not know who to thank… it was all very hush, hush, so we’ll just thank them both!

2 plating

Burr has also given the RELIANCE Project an early Christmas present! Burr brought over four capstans, three of which go on deck and the fourth onto the boom. Our next step will be to fabricate the teak pads and then fix it in place. The barrels turn, so we’re a little weary of showing these to Mike–our caster–who are is a miniaturist and clock maker. He’ll probably want to make the internal gears and ratchets!

20141124_153940

Meanwhile, rigging continues to go well. We’ve been worming, parceling, and serving the galvanized wire every day; hopefully that will be all finished soon.

20141115_14131820141115_14120420141115_141244