Tag Archives: laura

Topmast, Spreader, and Rudder Updates

We’ve now got the topmast lodged onto the rest of the mast’s body, with Herb working on some rigging details. While slaving away in his lonely corner of Building 28, Herb noticed an error on the spreader’s rigging: one of the wires was too short. Fortunately, he was swift to correct the wiring, and has since progressed on the spreader/mast system.

This slideshow requires JavaScript.

Keith is beginning the process of attaching the rudder to the model. He’s screwed a long metal piece–a set of gudgeons–to the back of the keel; the rudder will be pinned to this piece by a series of pintles.

This slideshow requires JavaScript.

An interesting fact we discovered is that the RELIANCE’s rudder was actually held up by a bearing attached to the lower part of the ship’s hull. Still figuring out how we’re going to work that into the design.

Meanwhile, Steve is working on setting up turnbuckles to be plugged and added to the overall structure.

20150922_114642

20150922_114811

Truss and Rigging Progress

Keith has been completing the truss and it is now mounted onto the mast.

20150825_182323 (1)

Laura has now started to fabricate and attach the truss and spreader guys.

20150825_125536

Meanwhile, Laura and Herb have been studying photos of the Reliance bowsprit and are now completing all the little bowsprit details.

20150824_134323

They have also completed the upper ends of the standing rigging and, as shown, have them tarred, varnished, and ready to go. We’re just a week or two away until the mast can be hoisted upright in our mast jig and the standing rigging can be completed at deck level.

20150825_182300

We thought we could find tasks for Steve that would not involve power tools, but Sandy caught the ever creative Steve with a Dremel tool in his back pocket… we’re just trying to excite his inner crafts person, but the power tool guy always comes to the surface…

20150825_125644

Deck Edge Milestone

Today marked another major milestone: the first deck edge toe rail went in place. We still have the port side to do, but we have the process well-proven; though we still have a lot of faring work to get the new railing to flow evenly as a continuation of the shell plating, but we can see how it’ll all work together. Whew, another risk milestone overcome!

These rails really change RELIANCE ‘s profile.
Keith and Bill, with help from Laura, Don, Sandy, and new volunteer Bern worked all day on the 24’ long starboard rail.

Bern has begun restoring the 1899 COLUMBIA topmast, which we’ll show in upcoming blog posts. Turns out that COLUMBIA’S topmast truck served as the model for RELIANCE’s, so we’re looking at this with great interest. As an exhibit accompanying RELIANCE, our COLUMBIA topmast will also show how massive these spars really were.

20150811_144928

20150811_144906

20150811_135348

20150811_135322

At last, the Big Day!

After more than a decade, RELIANCE moves off her shipping cradle and on to the display stand. Can you believe it?!!!

We moved RELIANCE to the back of the shed under the chain falls; we hoisted her out of the shipping cradle and said goodbye to that cradle. Our head rigger Laura holds RELIANCE aloft with one hand.

1 Laura holds boat up

As you can tell from their work, our female team mates are very talented, great team members, and very strong! Laura holds the bow up so Steve can position Bill’s display stand under the keel blocks.

2 Bow up!

3 Boat Hoisted, Steve moves cradle in place

Bill carefully lowers RELIANCE onto the 1,500 lb. steel plate while Keith inserts drift pins to assure alignment of bolt holes (since Keith measured and drilled the holes in the steel plate, he is actually out of the picture saying a couple of “Hail, Mary’s”: the secret of Notre Dame engineering, I’m told).

4 Bill lowers away

5 Alignment drift pins in - placing bolts in

Steve and Laura tighten the bolts in place, noting how perfect the fit is – no shims or alignment tricks needed!

6 Bolts tightened with precision

Here are the bolted blocks up close. Note the wooden wedges which keep the boat aligned fore and aft, and away from the blocks which were welded at a 15 degree angle. The engineers assured Sandy these wedges were unnecessary, but he’s a belt and suspenders guy and has been around engineers too long. (P.S. they were necessary!!.)

7 Wood wedges in place - No gaposis!

RELIANCE’s profile is revealed; beautiful, amazing form!

8 Wow!

9 knife bulb keel reveals itself

10 Maneuver complete. Now back to work area

RELIANCE is moved back to our work space and “The Guy Upstairs” Dave miraculously appears to inspect and approve our work.

11 THE GUY UPSTAIRS gives final  inspection and blessing

12 Aft view

Then Keith and Sandy replaced all the parts that had been stripped off RELIANCE for the full evolution.

13 back in its work area

14 Stuff goes back on deck

15 All back together

Bill has started building the grand stand to top it off.

16 Bill builds the grandstand

As part of the celebration, we have a Tuesday crew photo opportunity moment; unfortunately, camera shy Laura has gone to another job.

17 Formal Portrait. Herb, Keith, Steve, Sandy, Bill. Missing Laura

This respite is short, however; soon, everyone is back to work. Except, apparently, for Sandy, whom we’re sure needs some relaxation time!

19 Now, Everyone back to work on details

20 While the boss goes sailing

The Crew At Work

Keith works on the rudder between all the other tasks we give him. He likes engineering problems and more often than not come up with simple, innovative solutions. He has a Notre Dame engineering degree and Michigan advanced degree, so he’s a conflicted soul. Here it looks like he is invoking a higher spirit into a solution.

1 Keith's rudder

Steve is our amateur Astronomer, so we give him work on our mast so he can get closer to the stars.

2 Steve works on mast

Tim is a psychologist so we gave him 450 screws to set the boom sail track in place; it’s finicky work that requires precision. We try to play with his mind every once in awhile because we’re worried that in the background he’s writing a “tell all” book about the RELIANCE inmates. In this picture, he has about 150 screws in place – only 300 more, Tim! In the background, Herb is proving his wire to manila splicing technique.

3 Tim works on the boom

Meanwhile, Laura works on bowsprit rigging. The bobstays are tensioned by tightening the bowsprit retaining bar; there are no turnbuckles on the bobstays.

4 Laura splicing bowsprit rigging

5 Laura's Bobstays

Ken from Hall Spars dropped by on his evening constitutional and we talked about how boats today tension their shrouds with hydraulic mast rams since the turnbuckles are too short to perform this function. He also noted that on large racers rigging eyes are replacing tangs.

Back on Track

We’ve missed a couple of blog posts because we’ve been deep into detail work, which doesn’t seem to lend itself to blog creativity!

We’ve made a miniature exhibit of our winter lecture series presentation: “Wonderfully Modern Herreshoff Manufacturing Company”, which you can see in our shop if you come by for a visit.

Steve has been finishing the metal angle iron cheeks on the mast; these hold four upper main shrouds, forestay, two preventer stays (main running back stays), and the throat halyard strap.

Photo 2

Meanwhile. Keith has been working on the spreader, and you can see the start of Bill’s jig to make the deck-edge toe rails in the background; Sandy has also been filing, grinding, and polishing more than 150 shackles. You see these in rough form (dark bronze), polished state (bright brass), and finished nickel-plated product in the bins. Hooks are next, and then the dreaded 140 ash blocks from scratch.

Photo 3

Photo 4

Steve is also starting to work on the final tap and die work for all the turnbuckles.

Photo 5

Laura has been making grommets which turn into balloon jib straps, jib tack straps, jib pennants, spinnaker straps, and a throat halyard strap.

Photo 7

Photo 6

Lastly, Herb has become Bosun Splicer. Here’s his stock hanging on the rack awaiting finishing.

Photo 8

Getting Ready for Opening Day

Burr just delivered the RELIANCE bell, complete with a clapper, with engraving done by a South Carolina engraver. You can see its size compared to a U.S. Quarter! We can’t wait to see the reaction of our riggers when we tell them one of them will need to braid the cotton lanyard…

20150418_112554

Joe brought back our wood hatches, companionway, and monitor with final finishing. They look great and bring the deck to life.

20150418_111726

We’ve also finally received the uniforms for our 52 crew members! They look exquisite; thank you very much, Denise.

20150420_134502

Laura rigged the topmast shrouds and backstay eyes, and even brought her sister and parents to see her handiwork. Great to see pride for all involved!

Another Weekend in the Books

Keith put final touches on our spreaders; it really changes the whole boat! We can but imagine how large these were in real life.

bowsprit

bowsprit 1

Tim and Keith worked on tapping holes for eyes to go on the mast and we’ve screwed them in place temporarily to get everything aligned.

mast eyes

Soon we’ll remove them and send them to a nickel plating company along with some other fittings. Tim also finished up some leftover woodworking tasks while I was grinding and polishing new boom fittings that Mike delivered from our casting company.

Meanwhile, Laura, our rigger, has been doing a great job wire splicing as per usual, and even showed us how to make some tacks from wire grommets!