Tag Archives: laura

Museum Opening Day

The build up and preparation for Herreshoff’s opening day has been a bumpy road, but when we finally made it, we couldn’t have asked for a more successful and rewarding weekend.

Image.png20160426_17191220160426_09435620160412_09224820160412_144015

20160503_13311120160503_133319

 

Thanks to the crew who had been working diligently to make this day a reality! Available for some photos (from left to right) were: Don Berret, Sandy Lee, Tim Horton, Joe Uzzo, Herb Luther, Bern Altman, and Laura Thompson.20160501_114217

The Big Move, Pt. 2

Finally, after an arduous and careful trip down Burnside Street, the RELIANCE entered the museum’s large doors to find a new home within the Hall of Boats.

This slideshow requires JavaScript.

Then, it was on to rigging and mini-exhibits. RELIANCE will remain in this spot until opening day, when it is moved to its new temporary exhibit area in the back of the Hall of Boats and rigged with mast. Full rig will have to wait until the new atrium is built; it’s too tall by a dozen feet for this hall!

This slideshow requires JavaScript.

Join Us at the Frostbite Bash!

FrostBiteBash_Instagram-music-01

Please come and join the Herreshoff Museum and RELIANCE crew at the Frostbite Bash on February 6th!! There will be dancing, food, and the RELIANCE model set up in the museum in anticipation of opening day. It will be a wonderfully fun, two-for-one opportunity you can’t miss!

Working Towards the Bash

Great work session this past week; Keith and Sandy hung the rudder, Steve completed a dozen shackles, Herb completed several more splices, and Bill started the viewing stand. We’re on schedule to move RELIANCE to the Hall of Boats for the Frostbite Bash!

Please come and see our boat at the Bash! A sneak peek before we rig her.
PS: Enclosed is a picture of our new Executive Washroom; better late than never!

20160113_15174320160113_151628

Winter Progress

Work has been progressing over this early winter on all the details of the rigging; the blocks, splicing, and making up the shackles are all getting done. We recently dry-fitted the main sheet system. You can see Herb in the background making a micro-splice. Poor guy!

20160105_145129

The Saturday crew has been working with extra gusto!
Laura completed all splices for the two topmast backstay runners and started the wire-manila peak halyard tail splice. Joe has been repainting the deck which, over the past two years in the shed, has become shop worn; Bern has been helping with making blocks.

Meanwhile, Burr delivered his latest masterpiece: the topmast cone assembly. You may remember that last fall, Bill fashioned the lignum vitae truck, and several years ago, Mike cast a topmast cone. Well, Burr took those pieces, machined the cone, then made the topsail halyard sheave and metal housing, and assembled everything together. We couldn’t even find the housing solder joint. So awesome!

20160109_162707

Did we mention that the average age of these guys exceeds 80?!

Merry Christmas From Our Crew to Yours!

Laura made boom lift pennants and a peak halyard pennant. These doubled-over wires are made similarly to grommets: an endless loop of wire seized together at the thimbles  at each end. Thimbles at the mast are directly attached to the mast eyes with no shackles, so Laura makes up the wire on the mast.

20151212_121859

Sandy has been fabricating blocks; shown here are the eight 14″ blocks on RELIANCE, six including a double block for the main sheet (the other two are for the peak and throat jigs at the base of the mast).

20151213_18514520151212_13031720151212_142903

Bern routed out grooves for the straps and the strippers in the base of the block.

20151212_125641

Finally, here’s RELIANCE fully painted after Buck and Don’s hard work!

20151215_14243820151215_142501

Merry Christmas, happy holidays, and thanks to everyone who has supported us thus far!!

20151220_112257

 

 

 

 

An Interesting Side Story

Perry Ercolino and his wife visited about two years ago. Not only is he a sailor, but he also makes custom shoes in New York City on Madison Ave/53rd St.
Several days after their wonderful visit, we received a UPS package with a gift of leather from them to use on the gaff saddle! We’ve just recently attached it.
He also enclosed an off-cut of 18th-century reindeer leather which came off a Russian trading ship that sank in the Plymouth, England estuary late in that century. The leather was found in the remains of the ship when the harbor was dredged. By some odd circumstances, Perry managed to get his hands on it while on the road one day! How cool is that?
20151028_120816_resized20151028_153715_resized

Finally Past the Priming

Well, we can finally say that sanding, fairing, and priming the hull are finished!

We laid out the waterline with a laser transit. All reference marks are within 1/32nd-inch true! Thank you to Buck of Itchiban and Vinnie of Goetz Composites who brought a laser and great knowledge of getting RELIANCE on her fore and aft to lay out the laser lines.

Tracer lamp black solution has been applied to the hull. Sandy and Herb then sanded away the “orange peel” and tracer.

20151130_103204

Keith took down the tent and deck covering to clean up the boat using air, water, and sponge; for a finishing touch, a wash of denatured alcohol.

20151201_134953

So far, there was an initial priming of four coats and then sanding fair with 150 grit. This effort brought patches of bare hull and Bondo to light, so another five coats of primer were applied and another round of 150-grit “blocking”/ long boarding. Then, seven coats of white primer and 400-grit sanding to bring to near perfection.

RELIANCE is now ready for masking the waterline and painting the topsides. Only three more coats of paint on each of the topsides, bottom, and lead keel and an application of clear!

20151202_174813

While all this effort was going on, Bill has been working on the truck, Tim on the boom, and Yoda (Steve), shown here, on the shackle pins.

20151201_141148

New Feats and Footies

We’ve started assembling the jib halyard. Burr made all the links, while Bruce threaded he shackle pins. Bern tapped said shackles to receive the pins.

20151108_173219

20151107_163832

Meanwhile, the endless toil of filling and fairing both the rudder and the boat continues. Bruce, Bern , Zach spend plenty of their time working on this; just look how much dust we can make!

20151107_120325

20151107_115219

20151031_132919

Chris Broman visited the museum this past weekend, flush from victory with his “footie” yacht at the World Marine Trade Conference in Providence. He’d also attended a breakfast presentation Sandy gave there on the wonderfully modern Herreshoff Manufacturing Company.

We have our own “footie” champion, Mike, so the challenge has been issued!! Note, Chris has a split mainsail and boom; an airfoil shape but also goes wing and wing downwind! Just a little G2…

20151107_150645

20151107_150619

Prepping for Paint and Sails

The crew has been working diligently so that the RELIANCE model can be finished for the museum’s opening this coming spring.

We have put hanks onto the rigging for both the jib top sail and the stay sail; these pieces will be used to sew the sails directly into the rigging.

20151031_120429

20151031_113824

20151031_121909

Meanwhile, Laura is working hard to finalize the overall rigging within the mast system.

20151031_124202

20151031_114152

20151031_113814

While this has been going on, the struggle to perfectly fair the hull and keel has continued. Sandy spent a good portion of time on this duty, while Zach sanded the rudder down so that it would form well into place. He managed to take a short enough break to get a quick photoshoot!

20151031_114503

20151031_133636