Tag Archives: keel

Finally: The Painting Has Begun!

Early last week, Keith, Herb, Steve, and Sandy erected a tent frame to put the RELIANCE model under. Buck from the world-renowned Itchiban Yacht Painters stopped by to form the actual tent.

20151110_173700

20151111_165342

20151111_153538

On Thursday, Buck returned and put the first five coats of primer on the boat. Buck says he’ll come back on Monday with another person to block down the shear and keel, though he thinks it is “good enough.” I sense he’s really bought into our boat and it is now his boat! On Monday, the plan is that he’ll “block” long board the hull with 150 grit and then put another 3 coats of primer on. We will then sand to 400 grit and he’ll return for finishing coats.

20151112_144856

20151112_160845

20151112_144635

New Feats and Footies

We’ve started assembling the jib halyard. Burr made all the links, while Bruce threaded he shackle pins. Bern tapped said shackles to receive the pins.

20151108_173219

20151107_163832

Meanwhile, the endless toil of filling and fairing both the rudder and the boat continues. Bruce, Bern , Zach spend plenty of their time working on this; just look how much dust we can make!

20151107_120325

20151107_115219

20151031_132919

Chris Broman visited the museum this past weekend, flush from victory with his “footie” yacht at the World Marine Trade Conference in Providence. He’d also attended a breakfast presentation Sandy gave there on the wonderfully modern Herreshoff Manufacturing Company.

We have our own “footie” champion, Mike, so the challenge has been issued!! Note, Chris has a split mainsail and boom; an airfoil shape but also goes wing and wing downwind! Just a little G2…

20151107_150645

20151107_150619

Prepping for Paint and Sails

The crew has been working diligently so that the RELIANCE model can be finished for the museum’s opening this coming spring.

We have put hanks onto the rigging for both the jib top sail and the stay sail; these pieces will be used to sew the sails directly into the rigging.

20151031_120429

20151031_113824

20151031_121909

Meanwhile, Laura is working hard to finalize the overall rigging within the mast system.

20151031_124202

20151031_114152

20151031_113814

While this has been going on, the struggle to perfectly fair the hull and keel has continued. Sandy spent a good portion of time on this duty, while Zach sanded the rudder down so that it would form well into place. He managed to take a short enough break to get a quick photoshoot!

20151031_114503

20151031_133636

The Rudder Saga Continues

Over the past couple of weeks, we have been working towards finalizing the rudder addition. In the last blog post, you all saw Keith’s work at setting up the the set of pintles to the keel. Since then, the crew has added metal borders to each side of this pintle set. These borders were meant to keep the RELIANCE hydrodynamic when using the rudder.

20151010_112040

Afterwards, Bern got to work drilling and filing a hole into the bottom of the hull for the rudder’s stock to fit into.

20151010_134840

20151010_140830

20151010_141932

While this was being set up, Sandy and Zach spent time sanding the rudder’s stock in order for it to fit perfectly.

20151010_130657

20151010_131726

The result and almost finished product:

20151017_112451

Bowsprit Cone and Spreader Updates

Mike has been making wax molds for the angle iron cheeks on the mast. Now, he’s also making a new and improved bowsprit cone.

20150409_105533 20150409_105341

Meanwhile, Bill continues to work on the spreader. Keith used a mag drill to bore out the holes in the display base to which the keel blocks will be bolted.

20150407_111518

On a side note, Keith and Bill took some time off to respond to an SOS from volunteers making Herreshoff Museum’s new steam engine exhibit. It looks like we’ll be making some display stands. You all really need to see this exhibit!