Author Archives: Herreshoff Marine Museum/America's Cup Hall of Fame

About Herreshoff Marine Museum/America's Cup Hall of Fame

THE HERRESHOFF MARINE MUSEUM / AMERICA'S CUP HALL OF FAME mission is to educate and inspire the public about the history and innovative work of the Herreshoff Manufacturing Company and the America's Cup competition. The Museum, bordering beautiful Narragansett Bay, in Bristol, Rhode Island, is a maritime treasure. We regularly host classic yacht regattas, sponsor symposia on classic yacht design and restoration, and operate an outstanding sailing school for youth and adults. We celebrate excellence in design, innovation, education, and technology. Immerse yourself in exhibits about the Herreshoff Manufacturing Company, the America’s Cup, and fabulous people and yachts that were celebrated around the world. Participate in our extraordinary events and expand your horizons. Visit, join, and be a part of a great tradition.

Completion of WEE WINN

We have completed our restoration of Wee Winn to be prominently displayed in the Sidney Herreshoff room behind the reception area. We’ve a small punch list of items to complete including mast, gaff and rigging so she can be displayed “full up!” Come see Wee Winn and help celebrate her 125th birthday. Now in process of completing an exciting series of exhibits to accompany her.

Her owner Miss Winifred Sutton was a pioneer among women owning and racing their boats. In her first season, Wee Winn won 21 of 22 races out of Bembridge Sailing Club in the Solent against boats raced by men and women, winning the English half-rater class hands down!

We’ve also made a half hull and plaque to “celebrate women leaders in yachting.”

Gearing Up Wee Winn for Display

Work on Wee Winn has accelerated and we’re looking forward to moving her down into the main museum building for public display in the next few weeks!

A team lead by Steve Siok has been making the keel and lead bulb. Wayne engineered the fasteners for the angle iron to keel. Rick has bored out all the holes and attached angle iron to keel, and now drilled holes in the angle iron for attaching the keel assembly to the boat. Steve has lofted everything, created the master plan and now Sandy is creating the mold for the lead bulb. These photos show the keel and bulb.

Meanwhile, Art has returned from NH winter tundra to caulk the deck. Steve, Bill, Keith, and Rick have almost completed work on an incredibly creative display cradle. Wayne has finished fashioning the rudder and tiller assembly, and it should arrive next week. Herb, Eric and new hand Jim are hard at work completing all the spars. Bill and Keith are working on replacement floor boards and seats. Very soon Laura will be back to create the wire and manila rigging- in period fashion. And of course, Mike has been in the background making all the missing bronze fittings.

Meanwhile, We’ve been making commemorative half hull models for sale in the Museum store to pay for our work and some accompanying exhibit materials

Wee Winn: Before & After

Here’s a nice little compilation illustrating what a long journey Wee Winn has been through over these months. Look and be amazed at its transformation!

DSCN3718DSCN3719DSCN3846DSCN3848DSCN3849DSCN3850

Wee Winn is Coming Along

Wee Winn has been progressing a lot these past several weeks. Herb has been working diligently on the boom, while Steve had made a cradle for the boat.

20170404_10424020170404_104235

20170221_150843

Meanwhile, Zach and Sandy measured out and highlighted Wee Winn’s water-line with a laser light (which was running dry on its batteries, making the process much more tedious than it should have been).

20170422_13324420170422_113951

Once everything was up to their liking, the paint job began!

20170422_13574720170422_160935

More on Amaryllis

We have stepped Amaryllis’s rig for a photo opportunity. As with every such exercise, there arise several questions, closer examinations, and learning moments.
How was this catamaran really rigged and sailed? There is no apparent throat halyard, no apparent running back stays…
How was the jib rigged and jib club attached? How was the jib attached, raised, and sailed?
20170120_115834.jpg

Cleaning the Catamaran

Amaryllis, a catamaran built by Herreshoff, is being taken down from the rafters to be cleaned and re-hung for better viewing pleasure. Upon bringing it down for inspection, we were surprised to see a speedometer and underwater speed measurement device in the hull!

05103763-d98a-4666-ac00-4a68f4cc9dcb3f4b2796-bb13-46e2-ac5a-16896b620cc3

Here’s an old photo of the Amaryllis, for perspective.

amaryllis

Captain Nat and Wee Winn Updates

Volunteer Tom Tsuchiya recently finished up the miniature sculpture of Captain Nat Herreshoff. It’s now officially on display on the RELIANCE model; looks real!

Meanwhile, our restoration of WEE WINN has been coming along nicely.

Craig finished sanding the bottom and then painted Kirby’s primer, while Bern and Sandy spent the day replacing bungs and making shallow countersinks for many screws on deck so they can be covered with caulk.
20161217_104943
Earlier in the week, Herb continued to make the mast, Steve started making the display cradle, Eric steamed warped tiller arms straight, and Keith worked on the stern.