Solving Another Problem

RE Sturdy has once again done an awesome job of nickel plating our bronze pieces to look like real nickel steel. Here is the last batch of shackles as well as the rings to attach the staysail and jib topsail to their stays (Mike is currently fabricating the jib hanks).

20150818_101104

Bern installed the topmast heel rope sheave and topmast fid and slot. As you may remember, the topmast is sleeved into the mainmast.

20150824_125345

These efforts have revealed another Reliance conundrum. The hole in the upper and lower sleeves holding the topmast in place are 13.25″ in diameter, and the topmast is 13″ in diameter. The heal rope is .375″ diameter wire, so how could the topmast telescope into the mast? There isn’t enough clearance and there are no slots or holes noted in the drawings for the wire…

Bern has also been working on Columbia’s 1899 topmast and we’ve obtained detailed drawings of the cap and truck. Lo and behold, our Reliance topmast drawing refers to this drawing….so now we can complete this task as well.

20150824_125417

20150824_125448

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s