Our annual Fall Free Day is currently underway today (11/16). Come join us for a fun day full of activities including: guided tours, kids activities, hot cider, and so much more! And FREE ADMISSION! We hope to see you here.
Much progress has been made this week as you’ll soon see in the next few blog postings, coming soon.
We’ve assembled a diorama, several RELIANCE benches, augmented the RELIANCE PROJECT with ten other exhibits, and have cleared our spar bench to display other parts of RELIANCE. Come meet Capt. Barr and one of his crew. See the Education programs as well.
This week we assembled a diorama of RELIANCE’s wooden Spars – 4 foot sections of real-sized topmast and topsail spars.
Picture no. 1 shows (l. to r.) the no. 1 club topsail club, no. 1 club topsail yard, and topmast. In the background are the spinnaker boom and bowsprit which will have their own display. The diorama base will have aluminum plate covered in cork as on the real RELIANCE’S deck
The second picture show a bench we’re building, the seat of which is a 4′ section of the club topsail yard
Photo 3 shows the metal base that when sand-blasted and painted will become the base for the bowsprit section. We’ll drill holes in the bowsprit to receive the rods, so she’ll stand about two feet off the floor
Hopefully, we’ll have the spinnaker boom on its own stand and ready to go by Saturday
In real life, the topmast was 58′ 3″ long, the no. 1club topsail yard 68′ long, and the no. 1 club topsail club 57’6″ long. These would have held a no. 1 club topsail which luff was 105′ long! The spinnaker Boom was more than 83′ in length.